



In the spring of 2020, Cranshaw Construction renovated an industrial space at 960 Massachusetts Ave in the Roxbury/South Bay section of Boston by replacing the façade and building systems. In 2022, Cranshaw started the fit-out of 52,000 SF on the 2nd and 3rd floors for Boston Medical Center (BMC) to use as administrative offices. The design features perimeter offices, high-walled cubes, conference and training rooms as well as storage. Slopes in the existing floor heights required careful MEP coordination of ductwork and a mixture of exposed and dropped ceilings. A new gated surface parking lot of was created with the demolition of an automotive building on the adjoining lot. Turnover occurred at the beginning of November 2022.
Boston Medical Center
Margulies Perruzzi
52,000 SF
Our site uses cookies, tracking tools, and similar technologies that enable us and third parties to collect information about you online, including IP address, browser and device info, referring URLs, online interactions, and other usage and activity data. By clicking “Accept” below, you agree to use this site with all cookies enabled and acknowledge and accept our Privacy Policy which apply to your use of our Site.