











This Beacon Communities project in South Boston creates a total of 208 units within two new buildings. Designed by The Architectural Team, WaypointKLA managed the project. The soil was urban fill and was managed under a soil management plan. Demolition of the seven existing buildings as well as building hazardous material removal, environmental site remediation and other site including utility cut and cap work on the site began in the fall of 2022. Once demolition was complete, two new buildings were constructed. Phase Four created a building with 104 units and common space on the ground floor and Phase Five created a 104 unit building.
Both buildings achieved Passive House standards. Phase 4 attained LEED Platinum and Phase 5 is targeting LEED Gold (Multi-family Mid-rise v4) certification.
Both buildings are located steps away from Carson Beach and approximately a half mile from the Andrew Station on the MBTA Red Line, making it a Transit Oriented Development.
Photography: Andy Ryan
Beacon Communities/Boston Housing Authority
The Architectural Team
262,000 SF
Our site uses cookies, tracking tools, and similar technologies that enable us and third parties to collect information about you online, including IP address, browser and device info, referring URLs, online interactions, and other usage and activity data. By clicking “Accept” below, you agree to use this site with all cookies enabled and acknowledge and accept our Privacy Policy which apply to your use of our Site.