Cranshaw Construction | PORTSIDE AT EAST PIER – PHASE 2
23155
portfolio_page-template-default,single,single-portfolio_page,postid-23155,ajax_fade,page_not_loaded,,select-theme-ver-4.4.1,wpb-js-composer js-comp-ver-5.4.7,vc_responsive

PORTSIDE AT EAST PIER – PHASE 2

EAST BOSTON, MA

 

East Pier Buildings 5 and 6 consist of 296 apartments located on Boston Harbor and just a short walk from the MBTA’s Maverick Blue Line Station. The project also includes 308 below-grade parking spaces, and has a large amenity pavilion in the center with a pool and community rooms. Building construction consists of precast concrete piles, cast-in-place concrete garage, steel-framed amenity center and five floors of wood-framed panelized construction. The facade is combination of metal panel, masonry, and fiber cement.

client

Roseland/Mack-Cali

architect

Lessard Design

project cost

$92.6 Million

Size

297,000 SF