Interior photograph of kitchen and dining space in office.

Boston Medical Center Fit-out

Boston, MA In the spring of 2020, Cranshaw Construction renovated an industrial space at 960 Massachusetts Ave in the Roxbury/South Bay section of Boston by replacing the façade and building systems. In 2022, Cranshaw started the fit-out of 52,000 SF on the 2nd and 3rd floors

Interior photograph of corporate interior showing a communal dining area

Butterfly Network

Burlington, MA On behalf of Butterfly Network, who develops hand-held ultrasound devices, Cranshaw performed tenant fit-up of this new Class A office space located at The District Burlington.   The project included demolition of the existing 60,000 SF to accommodate three floors for their new world headquarters. Construction

455 Grand Union Boulevard & Tenant Fit-outs, Assembly Row

SOMERVILLE, MA 455 Grand Union Boulevard, home to Puma's North American headquarters, is a 14-story mixed-use building located in the Assembly Row development completed in 2021. Cranshaw built the core and shell for this 250,000 SF office building with 30,000 SF of ground-level retail and 335,000

Citizens Bank: Regional HQ at 200 Station Drive

WESTWOOD, MA 200 Station Drive is a four-story, Class A build-to-suit office building for Citizens Bank, located on the upper campus of University Station, a mixed-use development. The building is comprised of a four-story structural steel frame, composite concrete floor slabs over spread footing foundations totaling

photo of exterior of office building with 960 sign.

960 Massachusetts Ave

BOSTON, MA This project, which is located in the Roxbury/South Bay section of Boston, included removing two existing third floor additions, the existing ballasted roof, and construction of a new 30,000 SF addition on top of the existing building. The addition was constructed as a future

Chris Johnson Photo of interior of a lab. White industrial space with lab benches.

BRIGHAM & WOMEN’S HOSPITAL LAB/OFFICE AT LONGWOOD CENTER

BOSTON, MA Cranshaw Construction completed two tenant fit-ups for Brigham and Women’s Hospital located at Longwood Medical Center (LMA). Phase 1, completed in Summer 2017, consisted of 10,500 SF of office, conference and kitchen space. Phase 2 included 17,000 SF of office and 7,000 SF of

Confidential Software Client

BURLINGTON, MA Cranshaw successfully completed a 100,000 SF fit-out construction in three phases for a confidential software client within 14 months. The project included new offices with DIRTT office fronts, workstations, and kitchenettes on eight floors. A reception area and training space were added to meet

Photo of two men in a health clinic setting talking

HOME BASE Outpatient Behavioral Health Clinic

CHARLESTOWN, MA   As the general contractor for the Home Base Outpatient Behavioral Health Clinic, Cranshaw is proud to be part of an innovative project that revolutionizes the treatment of veterans’ mental health issues. Developed in partnership with the Red Sox Foundation and Massachusetts General Hospital, the

SHOES.COM

Shoes.com relocated from Boston's South Station area to Constitution Wharf in Charlestown. Cranshaw built out their 31,330 SF space, including base building window replacement, exposed concrete, carpet tile and reclaimed wood floors, open office workstations, a large open kitchen/gathering area, conference rooms and a roof

101 STATION DRIVE

WESTWOOD, MA 101 Station Drive was rebranded and renovated from a Class B space to a more modern, collaborative, Class A workplace that today’s tenants demand. To open the building to more natural light, the front entrance was pushed out, a transformer was relocated and the