Portfolio Categories Corporate Interiors
-1
archive,tax-portfolio_category,term-corporate-interiors,term-60,wp-theme-stockholm,qode-social-login-1.1.2,qode-restaurant-1.1.1,stockholm-core-1.0.6,select-theme-ver-5.1,ajax_fade,page_not_loaded,wpb-js-composer js-comp-ver-5.7,vc_responsive
Interior photo of Lobby refresh by Roberto Farren

404 Wyman Amenity Upgrades

Waltham, MA Cranshaw delivered a comprehensive renovation of key amenity and common areas, enhancing both functionality and the overall occupant experience. The project encompassed upgrades to the entrance canopy, lobby and atrium, the conference center, fitness center, café, and outdoor spaces, along with the integration of

Interior photograph of kitchen and dining space in office.

Boston Medical Center Fit-out

Boston, MA In the spring of 2020, Cranshaw Construction renovated an industrial space at 960 Massachusetts Ave in the Roxbury/South Bay section of Boston by replacing the façade and building systems. In 2022, Cranshaw started the fit-out of 52,000 SF on the 2nd and 3rd floors

Interior photograph of corporate interior showing a communal dining area

Butterfly Network

Burlington, MA On behalf of Butterfly Network, who develops hand-held ultrasound devices, Cranshaw performed tenant fit-up of this new Class A office space located at The District Burlington.   The project included demolition of the existing 60,000 SF to accommodate three floors for their new world headquarters. Construction

Interior photograph of laboratory at 99 Coolidge. Photo by Flaunt Boston.

Sonata Therapeutics Laboratory Fit-out

Watertown, MA Sonata Therapeutics is conducting research on reprogramming diseased cells and using their multi-cellular network to distribute the cure. Initially, they are concentrating on treating cancer but anticipate the approach will be able to address various other illnesses. Their new laboratory and office at 99

Exterior photograph by Flaunt Boston of brick office building

The Norfolk & Dedham Group Headquarters

DEDHAM, MA Cranshaw constructed the 49,000 SF three-story steel frame corporate office headquarters in Dedham Center. Cranshaw built the core and shell and fit-up the interior for the building's owner and tenant Norfolk & Dedham Group.   The new building includes a café and amenities on the first

455 Grand Union Boulevard & Tenant Fit-outs, Assembly Row

SOMERVILLE, MA 455 Grand Union Boulevard, home to Puma's North American headquarters, is a 14-story mixed-use building located in the Assembly Row development completed in 2021. Cranshaw built the core and shell for this 250,000 SF office building with 30,000 SF of ground-level retail and 335,000

Citizens Bank: Regional HQ at 200 Station Drive

WESTWOOD, MA 200 Station Drive is a four-story, Class A build-to-suit office building for Citizens Bank, located on the upper campus of University Station, a mixed-use development. The building is comprised of a four-story structural steel frame, composite concrete floor slabs over spread footing foundations totaling

photo of exterior of office building with 960 sign.

960 Massachusetts Ave

BOSTON, MA This project, which is located in the Roxbury/South Bay section of Boston, included removing two existing third floor additions, the existing ballasted roof, and construction of a new 30,000 SF addition on top of the existing building. The addition was constructed as a future

Chris Johnson Photo of interior of a lab. White industrial space with lab benches.

BRIGHAM & WOMEN’S HOSPITAL LAB/OFFICE AT LONGWOOD CENTER

BOSTON, MA Cranshaw Construction completed two tenant fit-ups for Brigham and Women’s Hospital located at Longwood Medical Center (LMA). Phase 1, completed in Summer 2017, consisted of 10,500 SF of office, conference and kitchen space. Phase 2 included 17,000 SF of office and 7,000 SF of

Confidential Software Client

BURLINGTON, MA Cranshaw successfully completed a 100,000 SF fit-out construction in three phases for a confidential software client within 14 months. The project included new offices with DIRTT office fronts, workstations, and kitchenettes on eight floors. A reception area and training space were added to meet